Blacksmith Master Mastery Tree: Every Node
The full Blacksmith Master mastery tree by point cost, which nodes gate whole systems, and a build order that reaches a profitable shop by day 30.
Mastery points are earned by crafting quality items, and the tree they buy is not a skill tree in the RPG sense. It is a building permit. Walls, floors, mines, forests, the shop itself and every metal past iron are locked behind nodes, which means the tree is really a queue of capabilities.
The start-here guide→ shows which of these nodes to take in the first twenty hours.

Carpentry (1) then Staff (2) come first, every run. They cost three points total and unlock the two workers that make every later node affordable.
The opening nodes
| Node | Cost | Unlocks |
|---|---|---|
| Carpentry | 1 | Carpentry Table, wooden products |
| Staff | 2 | Hiring, Staff Bench |
| Construction | 20 | Wall building and demolition |
| Discounted Wood | 30 | Cheaper wood purchases |
| Hiring 1 | 45 | Second hiring slot |
| Blueprint Upgrades | 50 | Blueprint quality upgrades |
| Assistants | 60 | Assistant workers |
| Discounted Ingots | 75 | Cheaper ingot purchases |
| 4th Hiring | 80 | Fourth worker slot |
| Extra Cart | 100 | Additional cart capacity |
The first 100 points are about people and materials. Construction at 20 is the one most players delay, and it is the one that hurts most: without it you cannot fix a bad room layout, and every later floor arrives with the same walls you started with.
The blacksmith master expand shop→ page goes deeper on the exact numbers and edge cases.
Space nodes
| Node | Cost |
|---|---|
| 2nd Floor | 100 |
| Basement | 300 |
| 3rd Floor | 600 |
| 4th Floor | 700 |
| 5th Floor | 800 |
Stairs cost 100 gold each regardless of which floor they serve. The second floor at 100 points is the best square-metres-per-point in the tree; the fifth floor at 800 is the worst.
Metal and production nodes
| Node | Cost | Unlocks |
|---|---|---|
| Smelting 1 | 150 | Smelter, Ore Crate |
| Smelting 2 | 200 | 10x6 smelter |
| Smelting 3 | 500 | 12x6 smelter, tier-three metals |
| Advanced Metalworking | 500 | Faster metal crafts |
| Sharpening Wheel | 500 | Blade finishing station |
| Pottery | 600 | Pottery Wheel, Painting Table, Kiln |
| Jewelry | 900 | Jewellery racks and gem storage |
Smelting 1 is the gate to the entire metal economy. A shop that reaches day 40 without it is buying iron ingots at retail and wondering why the margins are thin.
Gathering nodes
| Node | Cost | Unlocks |
|---|---|---|
| Oak Forest | 175 | Oak wood zone |
| Iron Mine | 200 | Iron ore zone |
| Silver Mine | 200 | Silver ore zone |
| Copper Mine | 300 | Copper ore zone |
| Pine Forest | 700 | Pine wood zone |
| Trade Routes | 700 | Four trade route slots |
The Iron Mine at 200 points replaces a 15 gold per ore expense with free ore plus miner wages. It pays back in roughly two weeks of normal production, which makes it the best production node in the tree.
Store nodes
| Node | Cost | Unlocks |
|---|---|---|
| Store | 125 | Selling blueprints from racks |
| Racks 2 | 300 | Second-tier racks |
| Racks 3 | 250 | Third-tier racks |
| Blueprint Upgrades | 50 | Higher blueprint quality |
| More Offers | 130 | More merchant offers |
| More Offers 2 | 250 | More merchant offers |
| Drinks Crate | 250 | +50 max stamina |
| Cauldron | 150 | +50 max stamina |
| Fire Pit | 400 | Faster stamina recovery |
Store at 125 is non-negotiable. Racks convert production into gold without merchant orders, and without it the shop is a contract workshop with a display window that does nothing.
Staff nodes
| Node | Cost | Effect |
|---|---|---|
| Staff | 2 | Hiring |
| Hiring 1 | 45 | Slot 2 |
| 4th Hiring | 80 | Slot 4 |
| Hiring 2 | 250 | Slot 5 |
| Hiring 3 | 150 | Slot 6 |
| Hiring Discount 1 | 150 | Lower hiring costs |
| Hiring Discount 2 | 350 | Lower hiring costs |
| Hiring Discount 3 | 500 | Lower hiring costs |
| Super Workers | 100 | Stronger workers |
| Elite Workers Boost | 50 | Elite at 17 orders instead of 20 |
| Assistants | 60 | Assistant class |
| Extra Cart | 100 | Cart capacity |
| Extra Cart 2 | 200 | Cart capacity |
Hiring 1 at 45 points is the first real power spike: a second smith doubles anvil throughput. Elite Workers Boost at 50 is the cheapest permanent stat gain in the tree if you complete orders steadily.
A build order that works
- Carpentry 1, Staff 2 (3 points).
- Construction 20 (23).
- Hiring 1 45 (68).
- Blueprint Upgrades 50 (118).
- Assistants 60 (178).
- Store 125 (303).
- 2nd Floor 100 (403).
- Iron Mine 200 (603).
- Smelting 1 150 (753).
- Smelting 2 200 (953).
- Advanced Metalworking 500 (1,453).
- Basement 300, Racks 2 300, Trade Routes 700.
That is not the fastest route to any single node; it is the route where every step immediately pays for itself. Store before the second floor because racks fund the stairs. Mine before smelting because ore is the input.
Nodes that look good and are not
- Fifth floor (800): space is not the constraint at 800 points; material supply is.
- Hiring Discount 3 (500): by the time you can afford it, hiring costs are a rounding error.
- Copper Mine (300): copper is the least valuable metal and the route to it is long.
- Pine Forest (700): pine products are heavy and slow; oak covers most carpentry needs.
How points are earned
Points come from crafting, weighted by quality. Higher quality items award more, which means the tree accelerates itself: better blueprints produce better items, which buy the next node faster. Anything that raises average quality — a Master Scholar, Blueprint Upgrades, a Sharpening Wheel — is indirectly a mastery point generator.
Official source: Hooded Horse wiki: Mastery Tree ↗ — node names and costs. Official source: Hooded Horse wiki: Shop ↗ — station prices and sizes. Official source: Hooded Horse wiki: Workers ↗ — hiring slots and elite threshold.
FAQ
How do I get mastery points fast? Craft high-quality items continuously. Quality, not quantity, is the multiplier.
Can I respec the tree? There is no documented respec. Treat every node as permanent.
What should I unlock first? Carpentry, Staff, Construction, then Hiring 1. Everything else waits.

